Booking BCA Periodic Façade Inspection (PFI) for Curtain Wall Buildings: Cost Guide for Singapore Owners

Introduction: How Much Does It Cost to Book a BCA PFI for Curtain Wall Buildings?

Booking a BCA periodic facade inspection for a curtain wall building in Singapore typically costs between S$12,000 for a small low-rise commercial property and upward of S$150,000 for large CBD towers with complex glass and aluminium envelopes. The final pricing depends heavily on building height, total façade area, the access method required, and the complexity of the curtain wall system itself.

Under Singapore’s Building Control regime, the PFI framework was implemented on January 1, 2022, and PFI applies to buildings over 20 years old that exceed 13 metres in height. For building owners and MCSTs managing aging curtain wall office towers, malls, and mixed-use complexes, understanding facade inspection cost is essential-not just for regulatory compliance, but to avoid last-minute surcharges that inflate budgets unnecessarily. Curtain wall systems carry specific technical risks that necessitate thorough evaluations, making these inspections a significant part of responsible asset management.

To be clear about scope: the costs discussed in this guide cover the inspection itself, report preparation, and Professional Engineer endorsement only. Remedial works such as glass replacement, sealant re-application, or anchor strengthening are a separate cost. Routine façade cleaning and repainting also fall outside the PFI fee.

This guide is written for commercial building owners, MCST councils, asset managers, facility managers, and REIT teams managing glass curtain wall buildings in Singapore-particularly those built before 2010 that are now approaching or have crossed the 20-year age threshold.

Here is what you will take away from this article:

  • How BCA’s PFI requirements apply specifically to curtain wall façades and why they cost more than simpler building facades

  • Typical cost drivers and current market price bands for curtain wall PFI in 2026

  • What is included and excluded in a PFI fee for curtain wall buildings

  • How to book a PFI step-by-step and avoid compressed-timeline surcharges

  • Strategies to control cost without compromising BCA compliance

An aerial view captures several high-rise office towers with glass curtain walls in a bustling urban financial district. This image highlights the intricate facade complexity and the importance of periodic facade inspections to ensure public safety and maintain the building's integrity.

Understanding BCA Periodic Façade Inspection (PFI) for Curtain Wall Buildings

Periodic facade inspection is Singapore’s statutory mechanism for ensuring that building facades remain safe for occupants and the public. For commercial buildings clad in glass and aluminium curtain wall systems-common across office towers, mixed-use complexes, and retail malls-the PFI process carries particular technical and financial weight. This section sets the regulatory and technical foundation before the guide moves into detailed cost breakdowns and booking steps.

What Is a BCA PFI and When Is It Required?

A BCA PFI is a mandatory facade inspection programme under the Building Control (Periodic Inspection of Buildings and Building Facades) Regulations 2021, refined through 2025–2026 circulars. A competent person-a registered professional engineer or registered architect with façade inspection certification-must conduct the PFI. Non-compliance with PFI can lead to fines and prosecution.

The key trigger criteria that affect curtain wall buildings are:

  • Height threshold: The building must be taller than 13 metres (roughly five storeys), with envelope walls exposed to weather.

  • Age threshold: The building must be older than 20 years based on its Temporary Occupation Permit (TOP) or Certificate of Statutory Completion (CSC) date. This means curtain wall offices completed before 2006 are now in active PFI cycles.

  • Inspection cycle: Buildings must be inspected every seven years after the first PFI.

Specific exceptions are narrow: single-storey structures under the height limit, temporary buildings, and residential landed properties are exempt. Most mid- to high-rise glass offices and malls are firmly within scope. The programme’s purpose is public safety-preventing falling glass panes, loose aluminium framing, and panel failures in dense pedestrian areas like Raffles Place, Orchard Road, and regional centres.

What Counts as a Curtain Wall Façade Under BCA Rules?

A curtain wall is a non-load-bearing external skin-typically glass and aluminium-hung off the concrete or steel frame of a building. It carries only its own dead load and transfers wind loads back to the primary structure. Under BCA’s PFI guidelines, “façade” explicitly includes curtain walls, cladding, siding, windows, and any exterior feature attached to the building.

Typical curtain wall types seen in Singapore commercial buildings include:

  • Stick systems with mullions and transoms assembled on site, common in mid-rise offices and medical centres

  • Unitised panels factory-assembled and crane-lifted into position, standard for Grade A office towers

  • Combination façades incorporating glass, aluminium cladding, stone infills, and metal panels across different elevations

Curtain walls are viewed as higher-risk façades in PFI for several reasons. Large, heavy insulated glass units (IGUs) are suspended at height. Complex anchors, brackets, gaskets, and structural sealants age differently and can fail without obvious visual cues. Defects such as deteriorating sealants and loose glass panels may not be visible from inside the building. There is also potential for spontaneous glass breakage, water ingress behind cladding, and corrosion at concealed fixings. BCA expects that accredited facade inspectors and the supervising competent person pay special attention to curtain wall anchorage, glass condition, and sealant life when developing their inspection plans.

Key Stakeholders: Building Owner, MCST, Competent Person and Façade Inspector

Understanding who is legally responsible for booking and paying for the PFI helps owners see how each cost component is built up.

  • Single-owner commercial buildings: The building owner or asset manager is directly responsible for appointing the CP, funding the inspection, and ensuring access.

  • Strata-titled offices and mixed-use developments: The MCST acts as the “owner” for common property, including the curtain wall façade.

A competent person must be a registered Professional Engineer (in civil or structural engineering) or a registered architect who has completed BCA’s Certificate in Façade Inspection course. The CP oversees the entire process-from inspection planning through report preparation and BCA submission.

A facade inspector is a trained inspection specialist-such as a Resident Engineer or Resident Technical Officer-who conducts inspections under the competent person’s supervision. Facade inspectors must document observations as instructed by the competent person. They handle drone operations, rope access work, and hands-on close-range checks under the CP’s direct supervision.

At Stellar Structures, we act as CP through our in-house Professional Engineers and coordinate drone, rope, or gondola teams as required, providing end-to-end PFI services for curtain wall buildings.

Two industrial rope access workers are conducting a visual inspection of the glass facade of a modern commercial skyscraper, utilizing specialized access equipment for their safety. This periodic facade inspection is crucial for identifying any facade deterioration and ensuring public safety through thorough reporting and professional review.

How BCA PFI Requirements Shape Cost for Curtain Wall Buildings

With the regulatory and technical foundation established, the practical question is how compliance requirements translate directly into quotation amounts and budget planning. Curtain wall buildings tend to sit in the mid to upper end of PFI costs because of their height, access logistics, and facade complexity. Understanding the mandatory and optional scope elements helps building owners anticipate what they will spend.

Mandatory Scope for Curtain Wall PFI

BCA sets a baseline inspection scope that every compliant PFI must include. These core tasks form the “floor” for professional fees, and any quote that omits them is unlikely to meet BCA’s expectations:

  • Desktop review of as-built façade drawings, specifications, and past repair records

  • 100% visual inspection of all accessible elevations (often via drones for taller buildings)

  • Sampling plan for close-range inspections-façade inspections often require a suitable percentage of close-range testing for regulation compliance, typically at least 10% of panels per elevation or more in high-risk zones

  • Specific inspection of curtain wall elements including glass condition, gaskets, sealants, brackets, anchors, and movement joints

  • Defect classification and repair recommendations-facade inspections must include defect grading, risk assessments, and repair prioritisation

  • Formal PFI report and certificate submission to BCA by the CP

The full compliance package includes visual checks, defect logging, and formal reporting. Inspection scope includes 100% visual checks and mandatory close-range physical checks, which is why a purely visual inspection is less expensive than a rigorous close-up inspection-but the close-range component is not optional.

Additional Scope Often Needed for Curtain Walls

BCA sets minimums, but aged curtain walls often demand more intensive investigation. Curtain walls with complex designs demand detailed evaluations during inspections, and common additions include:

  • Thermal imaging to identify water ingress or delamination behind cladding zones

  • Non-destructive tests such as pull-out checks on selected anchors or sealant adhesion tests

  • Borescopic checks at hidden brackets or anchors behind cover caps where facade deterioration may be concealed

  • Percussion testing to identify defects like debonded tiles in mixed-material façade zones

Each extra layer adds to both site time and professional review hours, increasing cost. At Stellar Structures, we can phase such investigations over two to three quarters to smooth cashflow for owners of large developments, allowing them to allocate time and budget more effectively.

Timeline Pressures, BCA Deadlines and Their Cost Impact

The typical PFI cycle for a 25–30 storey curtain wall building follows a demanding schedule. Once a PFI notice is received, building owners generally have 12–18 months. A practical breakdown looks like this:

  • 3–6 months from BCA notice to formal appointment of CP

  • 6–12 months for access planning, mobilisation, inspections, and rectification verification

Late appointment and compressed timelines drive up cost substantially. Higher access equipment rates result from peak demand for gondolas, boom lifts, and rope access teams. Overtime or weekend work premiums become unavoidable to meet BCA deadlines. There is also less opportunity to bundle elevations or neighbouring buildings for economies of scale. Time management at this stage directly affects how much the entire PFI process will cost.

Cost Breakdown: How Much Does PFI for Curtain Wall Buildings Typically Cost?

The figures below are indicative for Singapore as of 2026, based on typical commercial curtain wall buildings. Facade inspection costs range from SGD 10,000 to SGD 19,000+ for smaller or simpler buildings, while costs can reach SGD 80,000 to SGD 200,000+ for large developments. This section provides budget bands and then details which elements make up a quotation.

Indicative Cost Bands for Different Curtain Wall Building Profiles

Building size and facade type are the two primary variables that determine which price band applies:

Low-rise commercial building (5–8 storeys) with a simple glass-front stick-system curtain wall and straightforward access: approximately S$12,000–S$25,000 for a complete PFI-ready inspection and CP report. A low rise building with existing access infrastructure and uniform façades sits at the lower end of this range.

Mid-rise office or mixed-use building (9–20 storeys) with unitised curtain wall panels and standard gondola access: approximately S$25,000–S$80,000 depending on façade area, number of elevations, and whether multiple blocks are involved. Buildings in this category form the bulk of the commercial stock now entering PFI cycles.

High-rise CBD curtain wall tower (21–40+ storeys) with complex podium-and-tower configurations, multiple setbacks, overhangs, and mixed materials: approximately S$80,000–S$200,000+ including drone survey coverage and rope access sampling. Taller buildings require more intensive logistical planning and extended active hours on-site.

Very complex podium malls with skylights and atria, or multi-tower developments, can exceed these brackets entirely and require project-specific budgeting. Building height significantly influences facade inspection pricing across all categories.

The image depicts a close-up view of an aluminum curtain wall framing system featuring glass panels on a mid-rise commercial building, highlighting the intricate details of the facade. This type of structure may require periodic facade inspections by accredited facade inspectors to assess potential facade issues and ensure public safety.

Main Cost Drivers for Curtain Wall PFI

Building height and number of storeys: Taller curtain walls increase time on access systems, drone flight complexity, and the hours needed for image review and documentation. Specialized access equipment may be required for inspecting taller curtain wall buildings-each additional storey adds incremental cost for both labour and equipment.

Façade area and articulation: More glazing surface area means more inspection points, more photographs, and more segments to map on elevation drawings. Features like fins, ledges, deep sunshades, and overhangs create facade complexity that makes inspection more time consuming and expensive. Complex facade designs increase inspection time and costs.

Access method: Building access methods significantly affect inspection costs and safety arrangements. The difference between primarily drone-plus-gondola coverage versus heavy reliance on rope access or temporary scaffolding for recessed façades can shift costs substantially. Access methods such as rope access and gondolas influence labor expenses for inspections. Inspection method affects costs-drones are cheaper than scaffolding for the visual survey component, but cannot replace hands-on checks.

Complexity of curtain wall system: Unitised systems with bespoke brackets require more detailed anchor and movement joint checks than simple stick systems. Mixed façade materials (glass, aluminium, stone, metal panels) require different assessment techniques, adding specialist hours.

Documentation depth: A basic compliance report costs less than a highly detailed defect mapping package with marked-up elevation drawings, rectification schedules, and phased repair strategies. The reporting required under BCA sets a minimum, but many building owners need more detailed deliverables for their asset management programmes.

What Is Usually Included in a Curtain Wall PFI Fee?

A standard PFI package from Stellar Structures for a curtain wall building typically includes:

  • Initial consultation and review of the BCA PFI notice and building data

  • CP appointment, declaration to BCA, and inspection planning

  • Drone inspection or ground-based visual survey for 100% façade coverage, where permitted-visual inspections by drones require CAAS permits in Singapore, and drone surveys quickly scope buildings for facade inspections

  • Close range inspection to BCA sampling requirements using gondolas, rope access, or mobile elevating work platforms (MEWPs) as appropriate-close-range physical inspections involve hands-on checks of critical zones of the building

  • Defect logging, photographic records, and severity grading focused on curtain wall elements (glass, mullions, transoms, anchors, sealants)

  • Drones capture high-resolution data for facade assessments as part of the documentation process

  • Formal PFI report and CP’s certificate submission to BCA

When comparing quotes, owners must check that all these items are explicitly included. A quotation that bundles everything under a single line item without specifying these components makes it difficult to achieve a fair comparison.

Common Exclusions and Hidden Costs to Watch For

Identified defects during inspections must be addressed through appropriate remedial works-but those works are almost always excluded from the PFI fee. Other frequent exclusions from curtain wall PFI quotations include:

  • Specialist testing such as laboratory analysis of failed sealants, glass fragments, or failed fixings

  • Extended access hire or additional mobilisation if inspections are delayed by the owner or weather

  • Second or third site visits to verify rectification completion beyond a basic allowance

  • Temporary safety measures (netting, hoardings, cordoning) when unsafe defects are discovered mid-inspection

  • Panel removal to expose concealed brackets or anchors, which may be a separate cost item

Building owners should clarify whether temporary hoardings, night work, or lane closures for street-facing façades are included or billed separately. The competent person must notify authorities of unsafe defects immediately, and any emergency measures triggered by such findings will carry additional cost.

Step-by-Step: How to Book a BCA PFI for a Curtain Wall Building

Booking a curtain wall PFI follows a structured sequence. Getting the preparation right reduces quote variance and prevents compressed-timeline surcharges that inflate the final bill. Here is a practical roadmap.

Preparing Information Before You Request Quotes

The documents and data you prepare before soliciting quotes directly affect how much time CPs need to price the work-and how much contingency they build in for unknowns. Having a complete data pack ready can shorten quotation lead time from two to three weeks to under seven working days.

Key items to gather:

  • BCA PFI notice and deadline date-this anchors the entire schedule

  • Building layout plans, elevation drawings, and any curtain wall shop drawings or O&M manuals

  • Summary of past facade issues such as water leakage complaints, previous glass breakage incidents, or spalling concrete at podium levels

  • Photos of access constraints: adjacent buildings, narrow setbacks, main roads, MRT entrances, trees

  • Existing access infrastructure details: BMU tracks, gondola rails, balcony access points

Preparation at this stage removes uncertainty from quotations and lowers risk premiums. If façade drawings are missing or incomplete-common with older curtain wall buildings-the CP will need extra time to reconstruct details, which adds to the fee.

Key Booking Steps with a Competent Person

  1. Shortlist two to three CP firms with proven curtain wall PFI experience-including Stellar Structures-focusing on their track record with similar building profiles.

  2. Send a consistent data pack to each firm so quotes can be compared on a like-for-like basis.

  3. Arrange a site walk with the preferred CP to confirm access assumptions, validate the sampling strategy, and identify any facade issues visible from ground level.

  4. Agree scope, deliverables, reporting format, and programme, including buffer time before the BCA deadline.

  5. Formally appoint the CP and allow them to notify BCA of appointment as required under the regulations.

  6. Confirm coordination responsibilities between the CP, MCST or facility management team, and façade access contractors.

  7. Schedule the inspection with consideration for weather windows and tenant operations.

Typical Timeline From Booking to BCA Submission

For a typical 25-storey curtain wall building, expect the following staged timeline:

  • 2–4 weeks: Quotation, clarification, and CP appointment

  • 4–8 weeks: Access planning, method statements, permits, and scheduling of gondola or rope access teams

  • 2–4 weeks: Actual inspection work, often phased by elevation and weather conditions

  • 3–6 weeks: Defect analysis, risk grading, professional review, and report drafting

  • 1–2 weeks: Owner review, minor clarification, and final BCA submission by CP

The total time required from booking to completion is typically six to twelve months for a straightforward curtain wall tower. Urgent “crash programmes” can compress this timeline but almost always attract higher access equipment rates and manpower premiums. How much time is available between the PFI notice and BCA’s deadline directly determines whether the owner can schedule work at standard rates or must pay a premium.

A professional drone is hovering near a glass-clad commercial building, conducting a periodic facade inspection to assess potential facade deterioration. This drone inspection aids accredited facade inspectors in ensuring public safety and preparing necessary reports for building owners regarding facade issues and inspection costs.

Comparing and Controlling PFI Costs for Curtain Wall Buildings

Not all low prices represent good value, and not all high prices are justified. This section helps building owners compare quotes on a like-for-like basis and identify ways to optimise PFI cost without cutting corners on compliance.

How to Compare Quotes Beyond the Headline Price

When reviewing competing proposals for curtain wall PFI, focus on these comparison dimensions:

  • Inspection scope: Does the quote cover drone survey only, or does it include close-range checks to BCA’s minimum sampling percentage? A drone-only approach will not satisfy BCA PFI requirements.

  • Professional review depth: Is it a basic defect listing, or does it include priority grading and a repair strategy with recommendations?

  • CP/PE hours: How many hours are allocated for site review, meetings, and queries with the building owner or MCST?

  • Access method assumptions: Does the quote assume existing gondolas, or does it budget for rental of MEWPs, boom lift equipment, or rope access teams?

  • Report format: Is it a narrative-only document, or does it include marked-up elevation drawings with defect maps?

Ask each provider for a line-item breakdown so you can see where differences in cost originate. A quote that is 30% cheaper may simply exclude elements that will be billed as variations later.

Cost-Saving Strategies That Keep You Fully Compliant

Practical tactics to manage PFI cost for curtain wall buildings:

  • Appoint the CP early in the PFI window-ideally within weeks of receiving the notice-to secure off-peak access equipment rates and avoid rush premiums

  • Bundle inspections of the tower and attached podium, or neighbouring blocks within the same development, under one mobilisation to share access costs

  • Coordinate PFI with scheduled gondola maintenance so that access equipment hire is shared between maintenance and inspection budgets

  • Use drones for 100% initial visual coverage and then focus rope or gondola close-range checks on the high-risk zones the CP identifies-this balances thoroughness with cost efficiency

  • Phase inspection and rectification over multiple quarters to spread financial impact while still meeting BCA deadlines

Stellar Structures can propose tiered scopes-minimum-compliance versus enhanced diagnostic-so owners can align inspection depth with their budget and risk profile without falling short of inspection requirements.

Red Flags: When a Low PFI Quote Can Be Risky

Watch for these warning signs that a proposal may not meet BCA’s expectations for curtain wall façades:

  • No explicit mention of CP or professional engineer endorsement for the PFI report

  • Drone-only inspection with no allowance for close-range sampling-remember that rope access is used for close-range facade inspections and cannot be substituted entirely by drones

  • Unusually short site duration for very tall or large curtain wall buildings, suggesting inadequate inspection time

  • Vague language about deliverables-for example, a “summary report” with no sample template or mention of defect classification

  • No clear plan for managing unsafe defects discovered mid-inspection

Non-compliant or superficial PFIs can lead to re-inspection costs, BCA queries, and potential liability if façade incidents occur. The cost of doing it twice always exceeds the cost of doing it properly once.

Common Challenges When Booking PFI for Curtain Wall Buildings-and How to Solve Them

Beyond pricing, curtain wall PFIs bring practical challenges related to access, tenant coordination, safety, and operational disruption. Anticipating these issues during the booking phase saves both time and money.

Challenge 1: Limited Access and Tight Urban Sites

CBD curtain wall towers often face narrow setbacks, bus lanes, MRT exits, and adjacent buildings that complicate boom lift or scaffold deployment. These constraints affect both the inspection method and cost in Singapore depends on location and surroundings.

Solutions:

  • Start access planning early with the CP and access vendors to identify the most practical inspection method for each elevation

  • Use drones and rope access where gondolas or boom lifts are impractical-rope access teams are more agile in tight spaces

  • Schedule work during off-peak hours or weekends for elevations facing busy pedestrian or traffic zones

Challenge 2: Coordination with Tenants and Building Operations

Noise from access equipment, temporary closure of drop-off points, and privacy concerns for office tenants during glass inspections are common friction points. The inspection can be time consuming, and without proper coordination, it disrupts daily building operations.

Solutions:

  • Issue an advance communication plan to tenants with a clear schedule and safety brief

  • Stagger elevation inspections to avoid blocking all entrances simultaneously

  • Align noisy works-such as percussion testing or panel removal-with off-business hours where feasible

Challenge 3: Budget Constraints and MCST Decision-Making

MCST councils may struggle to get AGM approval for large PFI budgets, especially when no visible façade problems exist yet. The challenge is justifying a significant spend on preventive compliance.

Solutions:

  • Use clear, visual examples of past curtain wall failures in the region to illustrate risk-including cases of active recall situations and emergency panel replacements that cost far more than planned inspections

  • Obtain at least two compliant quotes with transparent scope and line-item breakdowns to justify the chosen provider to the council

  • Explore spreading payment stages (mobilisation, inspection, report) over different quarters to align with MCST cash flow cycles

Conclusion and Practical Next Steps

Periodic facade inspection is mandatory for aging curtain wall commercial buildings in Singapore, and the cost-while significant-is manageable with early planning, clear scope definition, and the right CP partner. Curtain wall buildings sit at the higher end of PFI pricing because of their height, access requirements, and the technical complexity of glass and aluminium systems. But cutting corners on scope or CP qualifications creates far greater risk: re-inspection costs, regulatory penalties, and potential liability for facade incidents.

The most effective way to control PFI cost is to maintain control over the process from the start:

  1. Confirm whether your building meets BCA PFI triggers (height above 13 m and age over 20 years)

  2. Gather drawings, your PFI notice, and basic façade information before requesting quotes

  3. Shortlist experienced CP firms like Stellar Structures with demonstrated curtain wall expertise

  4. Book a site walk to firm up scope, access strategy, and cost before committing

  5. Plan the inspection and rectification timeline backward from your BCA deadline, leaving buffer for weather and coordination delays

If you are preparing to budget for your building’s PFI cycle, contact Stellar Structures for a preliminary cost discussion or desktop site review based on your specific curtain wall building profile.

FAQ: Booking and Cost of BCA PFI for Curtain Wall Buildings

These are concise answers to common questions building owners and MCSTs ask when budgeting and booking PFI for curtain wall façades.

Is PFI more expensive for curtain wall buildings than for painted concrete façades?

Yes. Curtain wall façades involve more complex components-IGU glass, structural silicone, concealed anchors, gaskets, and metal panels-that each require different inspection techniques. Access is typically more demanding for tall glass-clad towers, and the facade complexity means longer inspection durations and more detailed reporting. A painted concrete or tiled façade of equivalent height will generally cost less to inspect.

Can I combine routine façade cleaning with PFI to save cost?

The inspection itself and cleaning are distinct activities with different objectives. However, if your building’s scheduled gondola maintenance or cleaning coincides with the PFI window, you can share access equipment mobilisation costs by coordinating both activities under one access booking. Discuss this with your CP during the planning phase.

How often will I need to repeat PFI after the first inspection?

Buildings must be inspected every seven years after the first PFI under current BCA rules. However, if the CP identifies severe defects-such as failed fixings or widespread sealant failure-BCA may require earlier follow-up checks or a full facade investigation before the next standard cycle.

Does insurance cover the cost of PFI for curtain wall façades?

Most building insurance policies do not cover PFI fees directly. However, some insurers may indirectly factor PFI compliance into their risk assessment when evaluating claims related to façade incidents. Maintaining a current PFI record is a practical risk management measure regardless of insurance coverage.

What happens if my PFI finds serious defects such as loose glass panels?

The competent person must notify authorities of unsafe defects immediately. The building owner is then responsible for implementing temporary safety measures-such as netting, hoardings, or cordoning-and arranging emergency rectification. These remedial works are a separate cost from the PFI fee itself and can be substantial depending on the severity and location of the defect.

Can a drone-only survey satisfy BCA PFI requirements for my curtain wall?

No. While drones are explicitly permitted for the visual inspection portion and are highly effective for initial full-façade coverage, BCA requires close-range sampling-typically at least 10% of each elevation-involving physical proximity checks. A drone-only approach does not satisfy BCA PFI requirements. The CP must use rope access, gondolas, or MEWPs for the close-range component.

How far in advance should I book PFI for a 30-storey tower?

At least 9–12 months before the BCA deadline. Taller buildings require extended lead times for access planning, safety method statements, and scheduling of specialist rope or gondola teams. Booking early also means you can secure better rates for access equipment and avoid rush premiums that can add 20–30% to the total bill.

Why choose Stellar Structures over a generic inspection contractor?

Stellar Structures provides integrated CP and PE services with deep curtain wall design and engineering expertise. Our team coordinates end-to-end-from drone survey and rope access inspection through defect analysis, report preparation, and BCA submission-under one appointment. This eliminates coordination gaps between multiple contractors and ensures the inspection is led by professionals who understand curtain wall behaviour, not just inspection procedures.

This entry was posted in All and tagged .

Leave a Reply