Introduction Fast tracking authority submissions in Singapore means coordinating URA, BCA, SCDF, JTC, and other agencies through concurrent approvals rather than sequential filings – a submission strategy that can compress project timelines by 30–50% on medium to large developments. With over 140 projects already processed through CORENET X and reported time savings of up to […]
Tag Archives: BCA
Introduction Industrial building modifications floor loading in Singapore must be checked before work starts: if the modification affects structural capacity, exceeds the approved floor load, or adds equipment over 400 kg, a professional floor load assessment and endorsement by a Professional Engineer (PE) are typically required to satisfy JTC and BCA requirements. Installing heavy equipment, […]
Introduction When BCA issues a PFI Stage 2 letter for your building, it means the periodic facade inspection has identified defects classified as “Require Repair” or “Unsafe”-and your MCST or building management must now engage a certified Competent Person (CP) to oversee detailed investigation, manage façade repairs, and submit compliance reports to the Building and […]
Introduction Any addition and alteration (A&A) or renovation project in Singapore that affects structural integrity, involves temporary works, modifies fire safety systems, or needs building plan approval will require a Qualified Person (QP). Under the Building Control Act, commercial and residential owners cannot proceed with works affecting structural elements, load-bearing walls, fire protection systems, or […]
Introduction Obtaining a Building and Construction Authority (BCA) permit is necessary before commencing structural works in Singapore. This permit – formally known as the Permit to Carry Out Structural Works, or ST Permit – is a distinct regulatory step that follows structural plan approval and must be secured before any physical construction begins on site. […]
Introduction Resident Engineers (REs) and Resident Technical Officers (RTOs) are the mandatory site supervisors who control concrete quality on Singapore construction projects. Their roles, defined under the Building Control Act (Cap. 29, 1989), cover everything from witnessing fresh concrete sampling to evaluating cube compression results and inspecting reinforcement before a pour proceeds. This article covers […]
Introduction Every construction project in Singapore operates under a legally mandated three-tier supervision framework that places a Qualified Person (Supervision), Resident Engineer, and Resident Technical Officer at the center of structural safety and regulatory compliance. Understanding how QP supervision in Singapore works-and how RE and RTO requirements under BCA intersect-is essential for anyone involved in […]
Introduction Facade structural inspections are a mandatory safety requirement for high-rise commercial buildings in Singapore. Under the Building and Construction Authority’s (BCA) Periodic Facade Inspection (PFI) regime, every building exceeding 13 meters in height and over 20 years old must undergo a thorough inspection of its building façade every seven years. This regulatory framework exists […]
Building a dream home in Singapore can be a daunting task, much like navigating a complex puzzle with many interconnected pieces. The Building and Construction Authority (BCA) in Singapore plays a crucial role in regulating the construction industry, and understanding its submission requirements is essential for landed property development projects. A thorough review of plans […]
The handling of petroleum and flammable materials in Singapore can be a double-edged sword – while they fuel the nation’s economic growth, they also pose a significant risk to the safety of its citizens and the environment. With the city-state’s dense population and thriving industrial sector, the potential for devastating fires and explosions is ever-present, […]