Introduction Managing dangerous goods hazardous substances in JTC facilities plan consent guidelines is a multi-layered process that demands coordinated regulatory approval from JTC, the National Environment Agency (NEA), and the Singapore Civil Defence Force (SCDF) before any diesel tank, LPG bullet, boiler, chimney, or petroleum and flammable materials installation can be commissioned. Operations managers working […]
Category Archives: All
Introduction JTC Annex A (also known as “List A”) identifies the specific Addition & Alteration (A&A) works on JTC industrial land that do not require prior JTC landowner plan consent. Published as part of the JTC Space Submission Handbook (Version 6.0, released 25 April 2025), Annex A covers 13 categories of minor internal, non-structural, lightweight […]
Introduction The WSH (Construction) Regulations 2007 are Singapore’s principal subsidiary legislation governing workplace safety and health on construction sites. Enacted under the Workplace Safety and Health Act (Cap. 354A), these construction regulations apply to every building operation and works of engineering construction carried out in Singapore-including new builds, renovation, alteration and addition (A&A), and demolition. […]
Can a loft conversion be approved in Singapore? Learn the planning, structural, fire safety, and condominium checks that determine feasibility upfront.
Singapore playbook tying SCDF Clauses 3.2 and 3.7 to onsite detailing, inspection pitfalls and a submission checklist to avoid rework.
Introduction Most JTC plan consent rejections have nothing to do with your design concept. They stem from avoidable drafting errors, missing documentation, and coordination oversights that trigger immediate rejection – often within just one to two working days. Understanding exactly why JTC rejects A&A plan submissions and how to prevent them can save your project […]
Introduction Any proposal to add a mezzanine, build an extra storey, or reconfigure space usage in a Singapore industrial building can trigger a Land Betterment Charge (LBC) – a statutory levy that directly increases project costs and affects lease compliance. For industrial lessees operating in JTC estates or private industrial parks, failing to account for […]
Introduction Post-construction compliance in Singapore is the structured sequence of statutory and contractual actions that stands between physical completion of your fit-out and the moment tenants can legally occupy, rent starts flowing, and security deposits can be released. For turnkey fit-out contractors and asset managers, obtaining a Temporary Occupation Permit (TOP) or Certificate of Statutory […]
Introduction Every development or alteration on JTC land in Singapore requires JTC plan consent – and that consent must now be submitted electronically through either CORENET 2.0 or CORENET X. Whether you are filing the JTC_LPD_SD.XFDX form for a qualified person submission, uploading CAD/BIM drawings colour-coded to JTC standards, or preparing allocation tables that demonstrate […]
Introduction JTC’s renovation process includes a structured 5-step framework that every construction project manager and renovation contractor must navigate before, during, and after physical works on JTC land. This 5‑step renovation approval flow spans from obtaining JTC plan consent through to securing an Electronic Permit-To-Work (EPTW), moving plans and supporting documents through the approval chain, […]