Introduction Selecting the right Qualified Person and supervision team is the single most consequential decision a developer or main contractor makes before breaking ground on any building project in Singapore. Appointing the right Qualified Persons is critical for regulatory compliance, and getting it wrong exposes your project to stop-work orders, cost overruns, and protracted authority […]
Author Archives: admin1
Introduction A Qualified Person (QP) who commands expertise across multiple disciplines delivers measurably better design outcomes in Singapore’s layered regulatory environment. When structural engineering, architectural intent, MEP coordination, and authority submissions converge under one experienced Professional Engineer, the result is fewer approval delays, reduced construction conflicts, and projects that actually perform as designed. This article […]
Introduction Er. Aman Aboobucker resolved complex structural challenges in Singapore infrastructure through systematic analysis, innovative design solutions, and close stakeholder coordination across MRT works, viaduct strengthening, and foundation settlement issues. Over nearly two decades in civil and structural engineering, he has applied advanced soil-structure interaction modelling, targeted ground improvement measures, and project-specific design optimisation to […]
Introduction Engaging Er Aman Aboobucker (PE Civil, PEB No. 4385) as your project’s Qualified Person means appointing a registered Professional Engineer with statutory authority to lead structural and civil engineering design, endorse authority submissions, and oversee construction compliance across Singapore. As the lead QP at Stellar Structures, Er Aman brings a focused approach to project […]
Introduction Fast tracking authority submissions in Singapore means coordinating URA, BCA, SCDF, JTC, and other agencies through concurrent approvals rather than sequential filings – a submission strategy that can compress project timelines by 30–50% on medium to large developments. With over 140 projects already processed through CORENET X and reported time savings of up to […]
Introduction Hiring a Qualified Person (QP) for construction supervision in Singapore typically costs between S$3,000 and S$8,000 per month for full time supervision, depending on project scale, complexity, and duration. A Qualified Person (QP) is a professional appointed under the Building Control Act – either a registered Architect or a Professional Engineer – who takes […]
Introduction Proper Resident Engineer (RE) and Resident Technical Officer (RTO) site supervision is the single most effective line of defence against costly construction rework and project delays in Singapore. Research into Singapore’s construction industry shows that client-related rework occurred in approximately 59% of 381 surveyed projects, raising project cost by an average of 7.1% and […]
Introduction Structural engineering compliance for JTC (Jurong Town Corporation) industrial developments in Singapore demands that every factory, warehouse, and production facility satisfies a layered set of statutory requirements, lease conditions, and safety codes – not just the tenant’s operational needs. Developers, contractors, and property owners working on industrial land must navigate submissions across JTC, the […]
Introduction Industrial building modifications floor loading in Singapore must be checked before work starts: if the modification affects structural capacity, exceeds the approved floor load, or adds equipment over 400 kg, a professional floor load assessment and endorsement by a Professional Engineer (PE) are typically required to satisfy JTC and BCA requirements. Installing heavy equipment, […]
Introduction When BCA issues a PFI Stage 2 letter for your building, it means the periodic facade inspection has identified defects classified as “Require Repair” or “Unsafe”-and your MCST or building management must now engage a certified Competent Person (CP) to oversee detailed investigation, manage façade repairs, and submit compliance reports to the Building and […]
